HOUSE BILL NO. 343

INTRODUCED BY A. NOONAN, KEANE, BLACK, BRENDEN, LAIBLE, WILLIAMS, KLOCK, HINER, MCNUTT, AUGARE, CAMPBELL

 

AN ACT REVISING DEFINITIONS FOR THE ADMINISTRATION OF THE RENEWABLE RESOURCE STANDARD FOR PUBLIC UTILITIES AND ELECTRICITY SUPPLIERS; ALLOWING ELIGIBLE RENEWABLE RESOURCES OWNED BY A PUBLIC UTILITY TO BE USED TO COMPLY WITH THE COMMUNITY RENEWABLE ENERGY PROJECT REQUIREMENTS IN THE RENEWABLE RESOURCE STANDARD; REQUIRING A UTILITY TO CONSIDER DISPATCH ABILITY AND SEASONALITY IN MEETING THE RENEWABLE RESOURCE STANDARD; AMENDING SECTIONS 69-3-2003, 69-3-2005, 90-3-1003, AND 90-4-1202, MCA; AND PROVIDING AN IMMEDIATE EFFECTIVE DATE AND A RETROACTIVE APPLICABILITY DATE.

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MONTANA:

 

     Section 1.  Section 69-3-2003, MCA, is amended to read:

     "69-3-2003.  Definitions. As used in this part, unless the context requires otherwise, the following definitions apply:

     (1)  "Ancillary services" means services or tariff provisions related to generation and delivery of electric power other than simple generation, transmission, or distribution. Ancillary services related to transmission services include energy losses, energy imbalances, scheduling and dispatching, load following, system protection, spinning reserves and nonspinning reserves, and reactive power.

     (2) "Balancing authority" means a transmission system control operator who balances electricity supply and load at all times to meet transmission system operating criteria and to provide reliable electric service to customers.

     (2)(3)  "Common ownership" means the same or substantially similar persons or entities that maintain a controlling interest in more than one community renewable energy project even if the ownership shares differ between two community renewable energy projects. Two community renewable energy projects may not be considered to be under common ownership simply because the same entity provided debt or equity or both debt and equity to both projects.

     (3)(4)  "Community renewable energy project" means an eligible renewable resource that:

     (a) is interconnected on the utility side of the meter in which local owners have a controlling interest and that is less than or equal to 5 megawatts in total calculated nameplate capacity; or

     (b) is owned by a public utility and has less than or equal to 25 megawatts in total nameplate capacity.

     (4)(5)  "Competitive electricity supplier" means any person, corporation, or governmental entity that is selling electricity to small customers at retail rates in the state of Montana and that is not a public utility or cooperative.

     (5)(6)  "Compliance year" means each calendar year beginning January 1 and ending December 31, starting in 2008, for which compliance with this part must be demonstrated.

     (6)(7)  "Cooperative utility" means:

     (a)  a utility qualifying as an electric cooperative pursuant to Title 35, chapter 18; or

     (b)  an existing municipal electric utility as of May 2, 1997.

     (8) "Dispatch ability" means the ability of either a balancing authority or the owner of an electric generating resource to rapidly start, stop, increase, or decrease electricity production from that generating resource in order to respond to the balancing authority's need to match supply resources to loads on the transmission system.

     (9) "Electric generating resource" means any plant or equipment used to generate electricity by any means.

     (7)(10) "Eligible renewable resource" means a facility either located within Montana or delivering electricity from another state into Montana that commences commercial operation after January 1, 2005, and that produces electricity from one or more of the following sources:

     (a)  wind;

     (b)  solar;

     (c)  geothermal;

     (d)  water power, in the case of a hydroelectric project that:

     (i) does not require a new appropriation, diversion, or impoundment of water and that has a nameplate rating of 10 megawatts or less; or

     (ii) is installed at an existing reservoir or on an existing irrigation system that does not have hydroelectric generation as of [the effective date of this act] and has a nameplate capacity of 15 megawatts or less;

     (e)  landfill or farm-based methane gas;

     (f)  gas produced during the treatment of wastewater;

     (g)  low-emission, nontoxic biomass based on dedicated energy crops, animal wastes, or solid organic fuels from wood, forest, or field residues, except that the term does not include wood pieces that have been treated with chemical preservatives such as creosote, pentachlorophenol, or copper-chroma-arsenic;

     (h)  hydrogen derived from any of the sources in this subsection (7) (10) for use in fuel cells; and

     (i)  the renewable energy fraction from the sources identified in subsections (7)(a) through (7)(h) (10)(a) through (10)(j) of electricity production from a multiple-fuel process with fossil fuels; and

     (j) compressed air derived from any of the sources in this subsection (10) that is forced into an underground storage reservoir and later released, heated, and passed through a turbine generator.

     (8)(11) "Local owners" means:

     (a)  Montana residents or entities composed of Montana residents;

     (b)  Montana small businesses;

     (c)  Montana nonprofit organizations;

     (d)  Montana-based tribal councils;

     (e)  Montana political subdivisions or local governments;

     (f)  Montana-based cooperatives other than cooperative utilities; or

     (g)  any combination of the individuals or entities listed in subsections (8)(a) through (8)(f) (11)(a) through (11)(f).

     (12) "Nonspinning reserve" means offline generation that can be ramped up to capacity and synchronized to the grid within 10 minutes and that is needed to maintain system frequency stability during emergency conditions, unforeseen load swings, and generation disruptions.

     (9)(13) "Public utility" means any electric utility regulated by the commission pursuant to Title 69, chapter 3, on January 1, 2005, including the public utility's successors or assignees.

     (10)(14) "Renewable energy credit" means a tradable certificate of proof of 1 megawatt hour of electricity generated by an eligible renewable resource that is tracked and verified by the commission and includes all of the environmental attributes associated with that 1 megawatt-hour unit of electricity production.

     (15) "Seasonality" means the degree to which an electric generating resource is capable of producing electricity in each of the seasons of the year.

     (11)(16) "Small customer" means a retail customer that has an individual load with an average monthly demand of less than 5,000 kilowatts.

     (17) "Spinning reserve" means the online reserve capacity that is synchronized to the grid system and immediately responsive to frequency control and that is needed to maintain system frequency stability during emergency conditions, unforeseen load swings, and generation disruptions.

     (12)(18) "Total calculated nameplate capacity" means the calculation of total nameplate capacity of the community renewable energy project and other eligible renewable resources that are:

     (a)  located within 5 miles of the project;

     (b)  constructed within the same 12-month period; and

     (c)  under common ownership."

 

     Section 2.  Section 69-3-2005, MCA, is amended to read:

     "69-3-2005.  Procurement -- cost recovery -- reporting. (1) In meeting the requirements of this part, a public utility shall:

     (a)  conduct conduct renewable energy solicitations under which the public utility offers to purchase renewable energy credits, either with or without the associated electricity, under contracts of at least 10 years in duration; and

     (b)  consider the importance of geographically diverse rural economic development when procuring renewable energy credits; and

     (c) consider the importance of dispatch ability, seasonality, and other attributes of the eligible renewable resource contained in the commission's supply procurement rules when considering the procurement of renewable energy or renewable energy credits.

     (2)  A public utility that intends to enter into contracts of less than 10 years in duration shall demonstrate to the commission that these contracts will provide a lower long-term cost of meeting the standard established in 69-3-2004.

     (3)  (a) Contracts signed for projects located in Montana must require all contractors to give preference to the employment of bona fide Montana residents, as defined in 18-2-401, in the performance of the work on the projects if the Montana residents have substantially equal qualifications to those of nonresidents.

     (b)  Contracts signed for projects located in Montana must require all contractors to pay the standard prevailing rate of wages for heavy construction, as provided in 18-2-401(13)(a), during the construction phase of the project.

     (4)  All contracts signed by a public utility to meet the requirements of this part are eligible for advanced approval under procedures established by the commission. Upon advanced approval by the commission, these contracts are eligible for cost recovery from ratepayers, except that nothing in this part limits the commission's ability to subsequently, in any future cost-recovery proceeding, inquire into the manner in which the public utility has managed the contract and to disallow cost recovery if the contract was not reasonably administered.

     (5)  A public utility or competitive electricity supplier shall submit renewable energy procurement plans to the commission in accordance with rules adopted by the commission. The plans must be submitted to the commission on or before:

     (a)  January 1, 2007, for the standard required in 69-3-2004(2);

     (b)  June 1, 2008, for the standard required in 69-3-2004(3);

     (c)(a)  June 1, 2013, for the standard required in 69-3-2004(4); and

     (d)(b)  any additional future dates as required by the commission.

     (6)  A public utility or competitive electricity supplier shall submit annual reports, in a format to be determined by the commission, demonstrating compliance with this part for each compliance year. The reports must be filed by March 1 of the year following the compliance year.

     (7)  For the purpose of implementing this part, the commission has regulatory authority over competitive electricity suppliers."

 

     Section 3.  Section 90-3-1003, MCA, is amended to read:

     "90-3-1003.  Research and commercialization account -- use. (1) The research and commercialization account provided for in 90-3-1002 is statutorily appropriated, as provided in 17-7-502, to the board of research and commercialization technology, provided for in 2-15-1819, for the purposes provided in this section.

     (2)  The establishment of the account in 90-3-1002 is intended to enhance the economic growth opportunities for Montana and constitute a public purpose.

     (3)  The account may be used only for:

     (a)  loans that are to be used for research and commercialization projects to be conducted at research and commercialization centers located in Montana;

     (b)  grants that are to be used for production agriculture research and commercialization projects, clean coal research and development projects, or renewable resource research and development projects to be conducted at research and commercialization centers located in Montana;

     (c)  matching funds for grants from nonstate sources that are to be used for research and commercialization projects to be conducted at research and commercialization centers located in Montana; or

     (d)  administrative costs that are incurred by the board in carrying out the provisions of this part.

     (4)  At least 20% of the account funds approved for research and commercialization projects must be directed toward projects that enhance production agriculture.

     (5)  (a) At least 30% of the account funds approved for research and commercialization projects must be directed toward projects that enhance clean coal research and development or renewable resource research and development.

     (b)  If the board is not in receipt of a qualified application for a project to enhance clean coal research and development or renewable resource research and development, subsection (5)(a) does not apply.

     (6)  An applicant for a grant shall provide matching funds from nonstate sources equal to 25% of total project costs. The requirement to provide matching funds is a qualifier, but not a criterion, for approval of a grant.

     (7)  The board shall establish policies, procedures, and criteria that achieve the objectives in its research and commercialization strategic plan for the awarding of grants and loans. The criteria must include:

     (a)  the project's potential to diversify or add value to a traditional basic industry of the state's economy;

     (b)  whether the project shows promise for enhancing technology-based sectors of Montana's economy or promise for commercial development of discoveries;

     (c)  whether the project employs or otherwise takes advantage of existing research and commercialization strengths within the state's public university and private research establishment;

     (d)  whether the project involves a realistic and achievable research project design;

     (e)  whether the project develops or employs an innovative technology;

     (f)  verification that the project activity is located within the state;

     (g)  whether the project's research team possesses sufficient expertise in the appropriate technology area to complete the research objective of the project;

     (h)  verification that the project was awarded based on its scientific merits, following review by a recognized federal agency, philanthropic foundation, or other private funding source; and

     (i)  whether the project includes research opportunities for students.

     (8)  The board shall direct the state treasurer to distribute funds for approved projects. Unallocated interest and earnings from the account must be retained in the account. Repayments of loans and any agreements authorizing the board to take a financial right to licensing or royalty fees paid in connection with the transfer of technology from a research and commercialization center to another nonstate organization or ownership of corporate stock in a private sector organization must be deposited in the account.

     (9)  The board shall refer grant applications to external peer review groups. The board shall compile a list of persons willing to serve on peer review groups for purposes of this section. The peer review group shall review the application and make a recommendation to the board as to whether the application for a grant should be approved. The board shall review the recommendation of the peer review group and either approve or deny a grant application.

     (10) The board shall identify whether a grant or loan is to be used for basic research, applied research, or some combination of both. For the purposes of this section, "applied research" means research that is conducted to attain a specific benefit or solve a practical problem and "basic research" means research that is conducted to uncover the basic function or mechanism of a scientific question.

     (11) For the purposes of this section:

     (a)  "clean coal research and development" means research and development of projects that would advance the efficiency, environmental performance, and cost-competitiveness of using coal as an energy source well beyond the current level of technology used in commercial service;

     (b)  "renewable resource research and development" means research and development that would advance:

     (i)  the use of any of the sources of energy listed in 69-3-2003(6) 69-3-2003(10) to produce electricity; and

     (ii) the efficiency, environmental performance, and cost-competitiveness of using renewable resources as an energy source well beyond the current level of technology used in commercial service."

 

     Section 4.  Section 90-4-1202, MCA, is amended to read:

     "90-4-1202.  Definitions. Unless the context requires otherwise, in this part, the following definitions apply:

     (1)  "Ancillary services" has the meaning provided in 69-3-2003.

     (2)  "Bond" means bond, note, or other obligation.

     (3)  "Clean renewable energy bonds" means one or more bonds issued by a governmental body pursuant to section 54 of the Internal Revenue Code, 26 U.S.C. 54, and this part.

     (4)  "Commission" means the public service commission provided for in 69-1-102.

     (5)  "Governing authority" means a council, board, or other body governing the affairs of the governmental body.

     (6)  "Governmental body" means a city, town, county, school district, consolidated city-county, Indian tribal government, or any other political subdivision of the state, however organized.

     (7)  "Intermittent generation resource" means a generator that operates on a limited and irregular basis due to the inconsistent nature of its fuel supply, which is primarily wind or solar power.

     (8)  "Internal Revenue Code" has the meaning provided in 15-30-101.

     (9)  "Project" means:

     (a)  a facility qualifying as a "qualified project" within the meaning of section 54(d)(2) of the Internal Revenue Code, 26 U.S.C. 54(d)(2);

     (b)  a community renewable energy project as defined in 69-3-2003 69-3-2003(4)(a); or

     (c)  an alternative renewable energy source as defined in 15-6-225."

 

     Section 5.  Effective date. [This act] is effective on passage and approval.

 

     Section 6.  Retroactive applicability. [This act] applies retroactively, within the meaning of 1-2-109, to the compliance year beginning January 1, 2009.

- END -

 


Latest Version of HB 343 (HB0343.ENR)
Processed for the Web on April 3, 2009 (2:40pm)

New language in a bill appears underlined, deleted material appears stricken.

Sponsor names are handwritten on introduced bills, hence do not appear on the bill until it is reprinted.

See the status of this bill for the bill's primary sponsor.

 Status of this Bill | 2009 Legislature | Leg. Branch Home
This bill in WP 5.1 | All versions of all bills (WP 5.1 format)
Authorized print version w/line numbers (PDF format)
[
NEW SEARCH ]

Prepared by Montana Legislative Services
(406) 444-3064